When and how long is the Load Management Interruption?

Heat Strips: December through March - typically between 7 am and 9 am, and usually interrupted for 1 hour.

Water Heater: January through December - typically between 3 pm and 6 pm, and usually interrupted for 3 to 4 hours in summer months and 1 hour in winter months.

Air Conditioner: June through September - typically between 3 pm and 6 pm, interrupted intermittently for 3 to 4 hours.


Show All Answers

1. What is Load Management?
2. When and how long is the Load Management Interruption?
3. Will I feel a difference in my heating / cooling or water temperature using Load Management?
4. Who do I call if I think there may be a problem with my Load Management Device?